Category: Monday Working Group

Monday 8 April

Two group totalling eleven members were working today. The three at Stone Cross Field built up the new stone bench to just below coverband level during the morning. Nine others met at the Abbey and went up to the top of the Cobbled Path, except for one who went to the Westwick steps, to give them some TLC. At the top of the Cobbled Path, the cobbles were scraped of debris and we began clearing the path around the De La Salle Field. We stopped at the bench, where a coffee break was taken; there is plenty more to do though. The

Read More »

Monday 25 March

On a wet morning only four turned up the Abbey, with another four at the Stone Cross Field bench. The bench team carried on building the north facing one, which like the south facing is curved (the east and west facing benches will be straight). The other four went to the dry pond on the Nature Park and began the remedial work, but finished early. At our next meeting on April 8th – we intend to perform a finger tip search of the Pond to remove all objects that could pierce the Liner.  On April 15th – the Liner will be delivered and

Read More »

Monday 18 March

We reached a grand total of thirteen today on a warm, dry Spring [nearly] day.  Eight of us went to the Cobbled Path and finished the clearance of more than three years of Autumn debris.  Next week we will go to the Westwick Steps and Driving Range path to do the same. Five of the bench group worked in Stone Cross Field on this beautiful day. We cut the turf and laid the foundation stones in preparation for building the second stone bench around the sycamore tree. 

Read More »

Monday 11 March

In total there were twelve working this morning. Eight people turned out at the Barns and went to the Cobble path to continue clearing the path. Another was also out doing his usual litter picking.  As the ground at Stone Cross Field was too soft after all the rain, the three bench builders decided to delay the start of the construction of the North bench, and instead went to collect more stone from the home of a local donor. We now have enough stone for all the other three benches – and two of the dressed stone cover slabs have kindly

Read More »

Monday 4 March

With seven of us meeting at the Barn and four on Stone Cross Field we had eleven today. Two of the bench builders went to Grindleford to collect the top slabs from Stoke Stoneworks whilst the other two mixed mortar and prepared the bed to receive them. The rest of the morning we spent aligning and levelling them. We can now report that the Stone Cross field southern facing bench has been completed. The group of seven cleared the outflows of the Abbey Pond, surveyed and measured the Pond in the Nature Park and began clearing the Cobbled Path of

Read More »

Monday 26 February

On a cold dry Morning, eleven members arrived for work. Two went to the ‘Westwick Steps’ and repaired two of them. The others went to the bottom pond in the Nature Park, to carry out the work identified by Angus, during his recent visit. We chopped down the self sets on the bank side and created a ‘rustic barrier’ to deter dogs from going in. The We still have some work to do but could do with a steer from he Council.

Read More »

Monday 12 February

Nine members assembled today with two separate tasks Six of us met one of the Rangers on Little Wood Bank, and began clearing Holly. We used hand tools while he was very industrious with a chainsaw. The cuttings will be chipped next week. At Stone Cross Field, three of us levelled and mortared the cover band ready for the top slab then took a template to deliver to the quarry so they can cut it appropriately.

Read More »

Monday 5 February

Seventeen of us worked today in 3 distinct Groups. On a dry but windy day, seven of us met at Stone Cross Field to continue working on the first of the benches around the sycamore tree. We have now reached the coverband stage and are ready to add the top stones once they have been shaped with the stone grinder. Three people went to Tony’s Steps and replace three steps; two on the long rise of steps and one on the flight of steps across to the right.. A fallen tree, on the top Path behind the Golf Club Car

Read More »

Monday 29 January

Stone Cross Field was the place to be today, when nine of us congregated there. A team of three began the work of constructing the planned stone benches. The foundation was laid, and then some of the bigger stones were piled on top to stop any vandalism – just in case! A group of four worked with a ranger who had brought 25 Alder Buckthorn and 25 Goat Willow whips for planting, and a truckload of mulch for spreading amongst the old and newly planted stock.

Read More »

Monday 15 January

Today is supposedly Blue Monday, but the eleven who worked today, were only blue from the cold. All but one went straight to the Gorse Patch and burned the Gorse, cut last week. The other member of the group collected quite a lot of litter from Beauchief Drive and around the Abbey Ponds. A Mercedes had been dumped and burnt-out in the Allotments Car Park over the weekend but had been removed by the time we began work. 

Read More »

Monday 8 January

Our first Morning of 2024, saw twelve group members arrive at the Gorse Patch, where we were quick to get going due to the cold temperature. The pre-Christmas cutting was continued to completion, and we will burn this next week.

Read More »

Monday 18 December

Seventeen members arrived for our final working morning of 2023. The gorse cut last week was burned. The fire was correctly reported to the FCC  at 9:31 and cancelled at 15:07 after a final check by Jon. At 11.00 am we were joined by the Group Chair and Secretary, who joined in with our Christmas  celebration. 

Read More »
Categories

Share:

Most Popular: