Category: Monday Working Group

Monday 24 April

Six members met up with Sheffield City Council workers at Stone Cross field to assist with mulching the saplings planted last year.  Three dumper truckloads of wood chip eventually appeared which we distributed across all the saplings and even had some spare to spread around the rather muddy path  by the litter bin. Five members met at the Barn and went to work on the Cobble Path clearing mud and compacted leaves.

Read More »

Monday 3 April

This morning was spent in surveying the area for tasks that needed attention. Most of our patch was covered by two teams. The grills on the middle pond were also cleared of debris; and one of the group picked litter from around the ponds and Beauchief Drive . The following tasks were identified: Lower path in Park Bank Wood Revetment replacement on the path past Tony’s Steps – approx.. 12m length with 10 stobs. Upper path from Bocking Lane end Revetment required near where paths meet before going down steps to road – approx. 3m and 3 stobs. Revetment required

Read More »

Monday 27 March

Six people turned up at the Barn and three at the top of Beauchief Drive. The Barn Group went to the top path in Park Bank Wood to move some of the revetment installed last week to route the path the correct side of the tree.  Stone rubble was also added on the path where it was uneven. A step on the Long Steps was replaced and blockages on the pond near the Abbey were cleared. The three members at Beauchief Drive cleared a fallen tree that was overhanging the saplings installed there.  We then moved to the heather patch where

Read More »

Monday 13 March

Only two members turned up on a mild but wet Monday morning.  The main work was path clearance of broken branches and trees following the heavy snowfall.  The Cobble path was dealt with and also by the Driving Range.

Read More »

Monday 20 February

Twelve members turned up at the Barn this morning.  Three headed to Hutcliffe Wood and the remaining nine ascended Beauchief Drive to Little Wood Bank.  In both cases we were removing the denser patches of holly to allow the standards to obtain more light and moisture for their growth.  It should also help the bluebells which were just starting to appear through the leaf litter. 

Read More »

Monday 13 February

Fourteen members turned up for work today. Three went to Hutcliffe Wood to clear a fallen oak which was blocking the upwards path at the Abbey Lane end then on to clear holly to create more light for bluebells etc near the Monkey Bumps. Six members cut back holly in Little Wood Bank, having received permission from the Council. The tall trees up from the middle of the bottom path were targeted to allow more light to reach the ground.  Leaves were also raked from the adjoining section of the bottom path. Afterwards there was an inspection of the path down to Twentywell

Read More »

Monday 6 February

Eight members turned up at the Barn on a glorious February day where we met with Nathan McWhinnie from SCC who wanted to find out more about what we do. Two members headed off to Hutcliffe Wood as a starter before hoping to cover the remaining woodland areas. A full report about what was agreed will be available in due course. The remaining six went up Beauchief Drive to where the surfacing material had been transported. From there we made some improvements to the path in Old Park Wood and cleared the steps of leaves before concentrating on the path

Read More »

Monday 30 January

Twelve members turned up at the Barn this morning – a breezy but relatively mild and sunny January morning. One went to collect litter, starting around the ponds Three headed to the orchard where they were installing the bench for a new seat there. Unfortunately, the railway sleepers which formed the support for the bench top proved rather harder than expected which bent nails and needed a strong drill bit. Eventually the seat was installed and tried out as shown in the picture. Eight headed to the Round Walk on leaf clearance duties.  Such was the endeavours of this group that the

Read More »

Monday 23 January

Ten members turned up at the Barn on a cold but sunny morning. Two went to the drystone wall near Fred’s Seat and duly worked on the capping stones and upper part of the wall before joining up with the rest of the group after coffee. The main party went to the Gorse Patch on Little Wood Bank where we removed the saplings remaining in the area recently trimmed of gorse. Some weeding was done around the heathers that were planted there recently but the soil was frozen so it was difficult to clear properly. Having cleared all the saplings that needed treating

Read More »

Monday 16 January

Nine members turned up at the Barn on a chilly morning.  Four headed to the path at the back of the Hall for resurfacing work and the remaining five started scraping and clearing the path from the Holly Path as far as Fred’s Seat.  Coffee was taken there by which time, first, soft hail and then snowflakes, started falling. After coffee efforts were made to demarcate the line of the footpath through the woodland to avoid trampling of the snowdrops and daffodils which are just beginning to appear. 

Read More »
Categories

Share:

Most Popular: