Category: Updates

Monday 24 June

The twelve of us who arrived today split into three tasks. Seven met at the Hamlet and began the clearance of the rough area at the back of the car park. It had become a dumping ground and shortly there is to be a tree and soil survey, prior to it becoming an extension to the car park. Four of us laid out the orientation of east and west benches in Stone Cross Field, cut the turf, levelled the trench bottoms and put in the footings for two rectangular benches. Easier for being rectangular rather than curved but more challenging

Read More »

Botany Evening – Thursday 20 June 

Ten of us met Gerry Firkins, a member of the Sorby Natural History Society, in the Nature Park lay-by on a lovely still evening to have a look at the plants in the meadow and also other areas of the Nature Park. Gerry is a specialist in identifying grasses, and many grasses were just at their best, so we learnt quite a few names. The names themselves are fascinating; Cocksfoot, Foxtail, Crested Dog’s-tail, Yorkshire Fog, Timothy, and many more. There were not many flowers out in the meadow, as it was rather early in the season for this meadow, but

Read More »

Monday 10 June

The ten folk that arrived today all met at the Nature Park pond, where we distributed the sand that was delivered, at 10.00 am, and began excavating Turf & Earth from the area to lay on top, as requested.This was a large job and we need to return to complete it, next week.Whilst there, we spotted Newts swimming in it and Mr & Mrs Mallard descended with great aplomb.

Read More »

Monday 3 June

Eleven workers met today, with nine at the Hamlet and two at the Driving Range. The Hamlet View Point was finished with all weeds and grass finally cleared from the cobbles, the edge of the top Car Park was also cleared of weeds and a number of flagstones , on the site,  were replaced or repaired. There is more work to do, so we intend to return.   The Driving Range path clearers used scythes and shears to cut back vegetation encroaching on the path alongside the driving range, between Bradway Road and Little Wood Bank, receiving several positive comments from

Read More »

Environment Weeks event – Saturday 25 May 

Nine people came along on a fine afternoon to our Environment Weeks event. We set off from Beauchief Abbey to walk up Beauchief Drive and couldn’t help noticing the Cow Parsley growing in the hedgerows on either side of the drive was prolific this year, and looked absolutely magnificent. The trees were in full leaf and looked beautiful. We went first to Gulleys Wood Meadow where Pignut was in flower everywhere and there was a great display of Buttercups and Yellow Rattle. We then went to the Nature Park noting plant species along the way. It was a lovely walk. 

Read More »

Monday 20 May

Thirteen of us went to the Abbeydale Industrial Hamlet today, and we were given a Tour of the areas requiring us to work on. We identified the three priority areas as follows: The path up to the viewpoint had become very slippery due to moss/weeds/grass growing in the gaps and they have closed it due to it being unsafe for visitors. So, on hands and knees we cleared most of it. We will do more in two weeks’ time. A seating area had become overgrown, this was cleared, so visitors can use it, but we were careful not to remove

Read More »

Monday 13 May

Fourteen members joined in today on a very warm morning. Thirteen went back to the new pond with one litter picking the area, who joined us at 11.00 am for John’s 80th Birthday celebration. We built up the pond side nearest the road, raising it around 30 cm and put more posts in to strengthen the fence.  Robins are nesting in the Barn, getting access under the Door Two newts have colonised the Pond. One was seen swimming in the water; the other was in the earth at the top of the pond side.  

Read More »

Monday 29 April

Thirteen members turned up to work on the pond liner and its surroundings.  During the morning we completed a fence around the pond and the required posts though ideally we need some more to improve the stability of the fence.  Flags (plants not stones) were strewn onto the liner to produce a more natural setting.  Some water had accumulated from Sunday morning’s rain and more is forecast for this afternoon so the pond may begin to look more natural. A wander around the area showed the saplings growing well and there is plenty of blossom on the orchard fruit trees.  On a less

Read More »

Monday 22 April

A gang of nine, on a wet morning, had a brilliant time at the Nature Park pond, laying the underlay and liner and beginning the surrounding fencing. Next week, if we’re all back, we should finish off the job.

Read More »

Monday 15 April

Q -What is an ideal situation when you lay a new Pond Liner A – For it to rain heavily after laying it, in dry conditions. So today was not so ideal, as the heavy rain came from the early morning, but there was no chance of cancelling the delivery, even though further work was impossible In the event, sixteen of the Group stood around in high winds, rain and hail, for the delivery which was over an hour late. Then using the driver’s hydraulic lift, we manhandled the bulky pond liner so far, until the mud beat us. But

Read More »

Monday 8 April

Two group totalling eleven members were working today. The three at Stone Cross Field built up the new stone bench to just below coverband level during the morning. Nine others met at the Abbey and went up to the top of the Cobbled Path, except for one who went to the Westwick steps, to give them some TLC. At the top of the Cobbled Path, the cobbles were scraped of debris and we began clearing the path around the De La Salle Field. We stopped at the bench, where a coffee break was taken; there is plenty more to do though. The

Read More »

Monday 25 March

On a wet morning only four turned up the Abbey, with another four at the Stone Cross Field bench. The bench team carried on building the north facing one, which like the south facing is curved (the east and west facing benches will be straight). The other four went to the dry pond on the Nature Park and began the remedial work, but finished early. At our next meeting on April 8th – we intend to perform a finger tip search of the Pond to remove all objects that could pierce the Liner.  On April 15th – the Liner will be delivered and

Read More »
Categories

Share:

Most Popular: