Monday 8 April

Two group totalling eleven members were working today. The three at Stone Cross Field built up the new stone bench to just below coverband level during the morning.

Nine others met at the Abbey and went up to the top of the Cobbled Path, except for one who went to the Westwick steps, to give them some TLC. At the top of the Cobbled Path, the cobbles were scraped of debris and we began clearing the path around the De La Salle Field. We stopped at the bench, where a coffee break was taken; there is plenty more to do though.

The two upper ponds in the Nature Park were inspected. The top one is full and the ’empty’ one is about 1/3rd full, we hope this is not a problem for the proposed work of re-laying the liner.