On the day of the Autumn Equinox, eleven of the Group met at the Store, and scanned the Task List for outstanding jobs.
Two went to Hutcliffe Wood began clearing the site where a new stone bench will be built and another took the mower to the SCC Depot for a service and a pull cord repair
The rest:
- Cleared the plastic pots from the Nature Park
- Replaced four of the Postman’s Steps
The two who went to Hutcliffe Wood took out the cherry laurel at the top of the BEG- installed steps at the Abbey Lane end; then dug out the foundations and transported a couple of barrow-loads of stone for the footings of the new bench.
